DAHTEC
  • Home
  • About Us
  • Products
  • Services
  • Career
  • Contact
Select Page

Fit the starter member into the jack base. Fit the first plan braces, rings downwards.

DSS Erection Procedure
← Clamp the first horizontal member. Insert and lock the first lift of triangle. Position jack base on the load distribution sole plates, at the intervals determined by the horizontal member. →
Skills

Posted on

October 6, 2026

Dahtec Marketing Sdn. Bhd. Logo

Address:
DAHTEC MARKETING SDN. BHD.(743017-T)

DAHTEC SDN. BHD. (839515-T)
No. 2, Jalan TPP 10, Taman Perindustrian Putra, Lebuhraya Elite 47130 Puchong, Selangor

GET IN TOUCH:
Email: info@dahtec.com
Tel: +603-8069 1988
Fax: +603-8066 5988
WhatsApp: +6012-358 1523

NAVIGATE:
Home
About Us
Products
Services
Career
Contact

PRODUCTS:
Dahtec Shoring System
Dahtec Modular System
Dahtec Formwork System
Dahtec Safety Netting
Dahtec Tubular System
Dahtec Frame Scaffolding

Copyright 2026 © Dahtec