Fit the triangle at lift 3, observing the safety regulations, protected by the temporary platforms from lift 1 are moved to lift 2. DSS Erection Procedure Skills Posted on October 6, 2026 ← Fit triangle at lift 4, still working safety from the second platform. Reverse the direction of the triangle. Erection must be carried out from inside the towers. →