DAHTEC
  • Home
  • About Us
  • Products
  • Services
  • Career
  • Contact
Select Page

Fit the triangle at lift 3, observing the safety regulations, protected by the temporary platforms from lift 1 are moved to lift 2.

DSS Erection Procedure
Skills

Posted on

October 6, 2026

← Fit triangle at lift 4, still working safety from the second platform. Reverse the direction of the triangle. Erection must be carried out from inside the towers. →

Recent Posts

    Recent Comments

    No comments to show.

    Archives

    No archives to show.

    Categories

    • No categories

    Recent Comments

      Archives

      Categories

      • No categories

      Meta

      • Log in
      • Entries feed
      • Comments feed
      • WordPress.org
      Dahtec Marketing Sdn. Bhd. Logo

      Address:
      DAHTEC MARKETING SDN. BHD.(743017-T)

      DAHTEC SDN. BHD. (839515-T)
      No. 2, Jalan TPP 10, Taman Perindustrian Putra, Lebuhraya Elite 47130 Puchong, Selangor

      GET IN TOUCH:
      Email: info@dahtec.com
      Tel: +603-8069 1988
      Fax: +603-8066 5988
      WhatsApp: +6012-358 1523

      NAVIGATE:
      Home
      About Us
      Products
      Services
      Career
      Contact

      PRODUCTS:
      Dahtec Shoring System
      Dahtec Modular System
      Dahtec Formwork System
      Dahtec Safety Netting
      Dahtec Tubular System
      Dahtec Frame Scaffolding

      Copyright 2026 © Dahtec