Position the new access platform and its ladder. Still working in safety from lift 3, protected by the triangle of lift 4, insert the standard or triangle frame. DSS Erection Procedure Skills Posted on October 6, 2026 ← Link up the standard or triangle frame with the horizontal member; Fit U-head. Fit triangle at lift 4, still working safety from the second platform. Reverse the direction of the triangle. →