DAHTEC
  • Home
  • About Us
  • Products
  • Services
  • Career
  • Contact
Select Page

Still working from the ground, fit the second lift of triangle, so that they face the opposite way. The triangle should be obligatorily pinned together.

DSS Erection Procedure
Skills

Posted on

October 6, 2026

← Position temporary erection platforms and the definitive platforms and ladder in the access lift of towers every 2 metres. Check that the structure is plump using the sighting device provided on each triangle sleeve. The upper and lower tubes should be in contact at each leg. Check the structure is level and plump. →

Recent Posts

    Recent Comments

    No comments to show.

    Archives

    No archives to show.

    Categories

    • No categories

    Recent Comments

      Archives

      Categories

      • No categories

      Meta

      • Log in
      • Entries feed
      • Comments feed
      • WordPress.org
      Dahtec Marketing Sdn. Bhd. Logo

      Address:
      DAHTEC MARKETING SDN. BHD.(743017-T)

      DAHTEC SDN. BHD. (839515-T)
      No. 2, Jalan TPP 10, Taman Perindustrian Putra, Lebuhraya Elite 47130 Puchong, Selangor

      GET IN TOUCH:
      Email: info@dahtec.com
      Tel: +603-8069 1988
      Fax: +603-8066 5988
      WhatsApp: +6012-358 1523

      NAVIGATE:
      Home
      About Us
      Products
      Services
      Career
      Contact

      PRODUCTS:
      Dahtec Shoring System
      Dahtec Modular System
      Dahtec Formwork System
      Dahtec Safety Netting
      Dahtec Tubular System
      Dahtec Frame Scaffolding

      Copyright 2026 © Dahtec