Check the structure is level and plump. DSS Erection Procedure Skills Posted on October 6, 2026 ← Still working from the ground, fit the second lift of triangle, so that they face the opposite way. The triangle should be obligatorily pinned together. Clamp the first horizontal member. Insert and lock the first lift of triangle. →