DAHTEC
  • Home
  • About Us
  • Products
    • Shoring System (DSS)
    • Modular System (DMS)
    • Tubular System (DTS)
    • Frame Scaffolding (DFS)
    • Formwork System (DFW)
    • Safety Netting (DSN)
  • Recent Projects
    • Bridge Construction
    • Safety Netting
    • MRT & Tracks
    • High Rise & Residentials
    • Shoplots & Retail Development
    • Hydroelectric Plants & Water Tanks
  • Services
  • Career
  • Contact
Select Page
Position temporary erection platforms and the definitive platforms and ladder in the access lift of towers every 2 metres. Check that the structure is plump using the sighting device provided on each triangle sleeve. The upper and lower tubes should be in contact at each leg.

Position temporary erection platforms and the definitive platforms and ladder in the access lift of towers every 2 metres. Check that the structure is plump using the sighting device provided on each triangle sleeve. The upper and lower tubes should be in contact at each leg.

by Aaron Peters | Oct 6, 2026

Erection must be carried out from inside the towers.

Erection must be carried out from inside the towers.

by Aaron Peters | Oct 6, 2026

Fit the triangle at lift 3, observing the safety regulations, protected by the temporary platforms from lift 1 are moved to lift 2.

Fit the triangle at lift 3, observing the safety regulations, protected by the temporary platforms from lift 1 are moved to lift 2.

by Aaron Peters | Oct 6, 2026

Fit triangle at lift 4, still working safety from the second platform. Reverse the direction of the triangle.

Fit triangle at lift 4, still working safety from the second platform. Reverse the direction of the triangle.

by Aaron Peters | Oct 6, 2026

Position the new access platform and its ladder. Still working in safety from lift 3, protected by the triangle of lift 4, insert the standard or triangle frame.

Position the new access platform and its ladder. Still working in safety from lift 3, protected by the triangle of lift 4, insert the standard or triangle frame.

by Aaron Peters | Oct 6, 2026

« Older Entries
Next Entries »

Recent Posts

    Recent Comments

    No comments to show.

    Archives

    No archives to show.

    Categories

    • No categories

    Recent Comments

      Archives

      Categories

      • No categories

      Meta

      • Log in
      • Entries feed
      • Comments feed
      • WordPress.org
      Dahtec Marketing Sdn. Bhd. Logo

      Address:
      DAHTEC SDN. BHD. (839515-T)
      No. 2, Jalan TPP 10, Taman Perindustrian Putra, Lebuhraya Elite 47130 Puchong, Selangor

      GET IN TOUCH:
      Email: info@dahtec.com
      Tel: +603-8069 1988
      Fax: +603-8066 5988
      WhatsApp: +6012-358 1523

      NAVIGATE:
      Home
      About Us
      Products

      Projects
      Services
      Career
      Contact

      PRODUCTS:
      Dahtec Shoring System
      Dahtec Modular System
      Dahtec Formwork System
      Dahtec Safety Netting
      Dahtec Tubular System
      Dahtec Frame Scaffolding

      Copyright 2026 © Dahtec Sdn. Bhd.